Finish & framing
Lumber, millwork and hardware coded separately from labor, so a kitchen remodel shows its real board-foot cost, not a lump “materials” line.
- 2100Lumber & sheet goods
- 2150Millwork & trim
- 2200Finish labor
- 2300Dumpster & haul-away
(516) 458-9666 contact@dovetailledger.com Mon–Fri 10am–5:30pm
Services · flat fee, invoiced
Four engagements, each quoted as one flat fee before work starts: a cleanup that squares up to twelve months of records, a job-costing build, monthly books closed by the 10th, and payroll with filings prepared ahead of their due dates. No hourly clock, no scope drift.
Built for the people who are on the tools all day:
Quoted in writing
The rate sheet
One-time. Typically 5–8 business days from upload.
Most startedOne-time. Typically two weeks.
Margin testedRecurring. Closed by the 10th of the following month.
Closed by the 10thRecurring. Weekly or biweekly pay runs.
Filed on timeCost-code trees, cut per trade
Lumber, millwork and hardware coded separately from labor, so a kitchen remodel shows its real board-foot cost, not a lump “materials” line.
Wire, panels and fixtures tracked per job, with permit and inspection fees on their own line and sub-electrician payments tied to a W-9.
Equipment, refrigerant and line sets costed to the install, with service-agreement revenue and warranty callbacks kept apart from new work.
Line items
Small jobs that sit beside an engagement. Each is quoted at the number below and invoiced with the engagement it belongs to.
| Item | Price |
|---|---|
| Extra cleanup monthBeyond the 12 months in a cleanup | $48 |
| QuickBooks Desktop → Online conversionFile converted and tied out | $120 |
| Certified payroll report (WH-347)Per report, public jobs | $65 |
| Additional W-2 employeeBeyond 6 on payroll | $17 / mo |
| Sub W-9 and COI trackingExpiry dates logged, 1099-NEC each January | $38 / mo |
| Estimate-vs-actual reviewOne-off margin report on a finished job | $95 |
Scope, stated plainly
Mon–Fri 10am–5:30pm
Twenty minutes on the phone, your last three statements, and a flat quote in writing within one business day.